少妇做爰免费视频网站裸体艺术_一级毛片在线观看免费_中文字幕一区二区精品_年轻的朋友在线免费观看_中文在线观看免费网站_国产免费网址

How to realize good explosion-proof performance of liquid ammonia emergency shut-off valve?

Time:2021-09-17
Generally, the regulation of pressure relief valve group, as an essential step in the operation process, also plays an important role in the whole construction process.

How to adjust the pressure relief valve group of the concrete pump truck correctly? In the construction process, if the operators move disorderly due to their unclear understanding of the performance of each part of the concrete pump truck, it will easily lead to various faults in the operation of the concrete pump truck, which will bring a lot of inconvenience to the on-site construction. Generally, the regulation of pressure relief valve group, as an essential step in the operation process, also plays an important role in the whole construction process.


1、Overflow valve regulation

When adjusting the pressure relief valve group, first adjust the condition of the overflow valve through the following steps: first loosen the adjusting rod of the superimposed overflow valve under the electromagnetic directional valve on the main valve block, and then tighten all the adjusting rods of the unloading overflow valve on the pressure relief valve group. Remove the electromagnet plug on the main overflow valve, press the positive pump button, then slowly adjust the superimposed overflow valve, observe the reversing pressure gauge, and lock the adjusting rod if the pressure is.


2、Accumulator unloading ball valve regulation

After adjusting the overflow valve, the adjustment of the accumulator unloading ball valve is also very important. The operation steps are as follows: open the accumulator unloading ball valve, loosen all the adjusting rods of the unloading overflow valve, then close the accumulator unloading ball valve, slowly tighten the adjusting rod of the unloading overflow valve, and then observe the condition of the reversing pressure gauge. When the pressure indication is 16MPa, the adjustment can be stopped, Lock the adjustment lever.


3、Regulation rules

In the whole regulation process, because the gear pump is connected with the accumulator, the pressure changes slowly during regulation, and attention should be paid not to be too fast during regulation. After adjustment, plug in the electromagnet plug on the main overflow valve to stop pumping.

主站蜘蛛池模板: 毛片在线一区二区观看精品 | 欧美亚洲日本国产其他 | 国产开嫩苞视频在线观看 | 国产亚洲精久久久久久小说 | 无码中文字幕av免费放dvd | 床震吃胸膜奶视频456 | 亚洲精品网站在线观看 | 国语对白做受XXXXX在线中国 | 一本久道综合在线中文无码 | 国产日韩精品一区二区在线观看播放 | 精品欧美一区二区三区久久久小说 | 精品国产一区二区三区2021 | 免费黄色在线视频 | 99不卡 | 日本无码一区二区三区在线 | 咖宝车神第四季免费 | 99热手机在线观看 | 中文字幕久久精品无码 | 在线观看成人无码中文AV天堂不卡 | 欧美性猛交xxxx乱大交be | 特级淫片aaaaaaa级附近的 | 91一区二区三区久久久久国产乱 | 爱爱爱av| 一级不卡毛片 | 国产在线亚州精品内射 | 午夜妇女AAAA区片 | 一个人看的www日本高清视频 | jizz国产精品网站 | 日本欧美一区二区三区在线观看 | 夜夜嗨av一区二区三区中文字幕 | 久久久久亚洲精品成人网小说 | 亚洲午夜精品久久久久久高潮 | 国产精品乱人伦 | 国产综合成色在线视频 | 日韩精品一区二区三区色 | 影音先锋aⅴ男人资源先锋影院 | 91三级在线 | 久久久免费精品国产一区二区 | 日本肉体裸交XXXXBBBB | 狠狠色综合激起情丁香色五月 | 久久中文字幕无码中文字幕有码 |